Surface preparation :
-
1Apply the product to a clean and dry surface, both to the surface and the core.
-
2Depending on the brittleness of the material, clean manually using a brush or chemicals.
Application :
- Use the product in its pure form, do not dilute.
- Carry out a preliminary test.
- Apply until saturation of the support in 2 coats with an interval of at least 10 minutes.
- Protected drying: 24 hours.
- Optimum efficiency reached after 7 days of drying.
- The treated material cannot be covered by another coating.
For further information, refer to the data sheet and safety sheet.
-
5L