Surface preparation :
-
1
Application :
- It is essential to carry out preliminary tests.
- Use the product in its pure state: do not dilute or mix with other products.
- Shake the can well before use.
- The support must be perfectly clean and dry.
- Apply the product uniformly in a mist jet, preferably at the end of the day.
- A drying time of at least 8 hours must be observed after application of GTP® for optimal efficiency.
- Repeat the operation after each complete washing with high pressure.
For further information, refer to the data sheet and safety sheet.
-
25L
-
200L
-
1000L